Factory audits & supplier assessment
Assess production capability, quality controls, equipment records, calibration and material traceability before committing to supply.
Outputs: capability findings, gaps and corrective actions.

ASG Assurance
Glass inspection and quality assurance in China, with Australian project oversight. Know what has been checked before your glass leaves the factory.
Discuss your inspectionFactory records can be difficult to assess from Australia. ASG Assurance connects agreed project requirements with on-site checks, traceable records and a clear account of the findings.
You can engage us when buying directly from your own supplier. We agree the inspection scope with your team and identify the evidence needed for your project.
Explore the inspection scopeSpecialist glass inspection
Verify heat-soak processing against the applicable requirements of EN 14179-1:2016 and your agreed project scope. Bring visibility to a process that is otherwise hard to assess from a distance.
EN 14179-1:2016
Heat-soak process inspection
Batch identity, process records and inspection findings brought together in one traceable evidence trail.
Request a heat-soak inspectionMatch project glass and batch identifiers with loading records and the heat-soak cycle under review.
Review the furnace identification, calibration evidence and relevant process-control records within the agreed scope.
Check recorded heating, holding and cooling stages against the applicable requirements. Identify interruptions, missing data or records that cannot be verified.
Distinguish on-site witnessing from retrospective document review. Report findings, non-conformances and the evidence needed for corrective-action closure.
Heat soaking reduces the risk of nickel-sulphide-related spontaneous breakage; it does not eliminate it. This standard covers monolithic flat thermally toughened soda lime silicate safety glass. Curved glass and additional assembly requirements need separate assessment. View the standard scope.
Choose a focused inspection or an agreed programme of factory, production and shipment checks. Each engagement starts with a defined scope and evidence requirements.
Assess production capability, quality controls, equipment records, calibration and material traceability before committing to supply.
Outputs: capability findings, gaps and corrective actions.
First-off and in-process checks for glass build-up, dimensions, visual quality and agreed tolerances. Scope can include IGU construction and sealing, roller wave and bow, and test witnessing.
Outputs: inspection records, photographs and non-conformance findings.
Check the agreed order, quantities, glass identification, packing and loading arrangements before dispatch. Record unresolved issues and the evidence relevant to a release decision.
Outputs: packing and loading records, batch links and outstanding issues.
Review proposed glass specifications, evidence requirements and factory interfaces early, so the inspection programme addresses the risks that matter to your project.
Outputs: scope clarification, risk items and an evidence schedule.
Coordinate inspection points, factory responses, document revisions and corrective-action follow-up across the agreed programme. Connect the factory evidence with your Australian project team.
Outputs: progress updates, issue tracking and coordinated reporting.
What your team receives
The report should make the inspection understandable: what was checked, which requirements applied, what was found and what remains unresolved.
An agreed scope, applicable project documents, sampling approach and inspection points.
Batch references, photographs, measurements and the records reviewed, with the limits of the inspection clearly identified.
Non-conformances, missing evidence and follow-up actions, including who needs to make the next decision.
A documented record of the evidence reviewed for closure. Factory statements and witnessed findings are identified separately.
Inspection scope, sampling, access and reporting requirements are agreed before work begins. Inspection reports do not replace accredited laboratory testing or design certification. Release, concessions and design changes remain with the authorised decision-maker.
Start with your project
Share the glass type, project requirements, factory location and timing. We will discuss the scope and prepare an inspection quotation.